Thursday, 29 November 2012
Thursday, 4 October 2012
Syndicated Project for Rope Shovel Benchmarking in Russia
GBI are formulating a syndicated benchmark specifically for rope shovels in Russia with a focus on the Kartex EKG range. If you have these machines and would like to participate in this benchmark to find out how your equipment is performing compared to Best Practice please contact me for more information on laura.seviour@gbimining.com.
Thursday, 26 July 2012
Truck and Loader Matching Part 6
This blog I want to present a
case study where a mine had a large shovel with 44 CuM dipper loading 218 tonne
trucks perfectly in two and a half passes! (Situation normal for most!)
The dilemma, faced by multitudes of mines around the world, is do you put a
third small pass in the truck or do you send it away 80% full?
The average payload of the
shovel was 85 tonnes. The original methodology for determining the match
was not known but the performance of the dipper was quite good when looking
around the industry. It appears likely that the original aim was to fill
the 218 tonne trucks in three passes. Two passes sent trucks away with an
average of 170 tonnes payload. The decision was made not to put the third
pass into the trucks due to the loss in productivity, damage caused to trucks
by overloading and the increased spillage.
The desired average payload was
218 tonnes per truck (109 tonnes per dipper). The mine had a quote from
the OEM to change the boom geometry of the two shovels and provide two new
dippers. Quote was for $6M+.
Using a combination of data
analysis and physical modelling four stages of work were undertaken with the
following outcomes;
Stage
1 Analyse data. Process changes
recommended. Discussions held with operators.
Result - Payload
increased to 95 tonnes on average which was in line with best practice dipper
performance.
Stage
2 Physical modeling of the
existing dipper, the supplier’s recommended dipper and two boom geometries.
Result – Modelling
proved accurate. Modelling demonstrated under-performance of supplier’s
recommended dipper relative to existing dipper. Recommendation made not
to change boom geometry. Recommendation not to purchase new dipper due to
substantial under-performance. Recommendation to test changes to existing
dipper.
Stage
3 Physical modeling of changes
to the dipper.
Result – A number
of changes had a positive impact on payload but none gave enough by themselves
to increase payload to 109 tonnes. Recommendation to conduct further testing
combining various options to modify the dipper.
Stage
4 Four options were presented
which met the target 109 tonne average
payload,
(Figure 1).
The mine chose the preferred
option with a slight change, engaged a structural engineer to design the
modifications and a local business undertook the modifications to one dipper
(Figure 2).
End Result
All up cost $350,000, Average Payload 111 tonnes. Value to mine at the time $8M
per annum.
Consequently a second dipper
was modified for the second shovel.
All up cost was $470,000 with
two dippers achieving 111 tonnes and 109 tonnes average payload. Cash saved on
the project >$5.5M. Value to the mine $15M per annum.
The most important lesson here
is that you can’t achieve anything if you won’t have a go. The four
stages here took 18 months and were rigorously evaluated before proceeding, but
the key is that they did it and they added real value.
Monday, 16 July 2012
Truck and Loader Matching Part 5
This blog continues to
investigate the issue of why many trucks are being perfectly loaded in 2.5 or
3.5 passes. In this discussion I am looking at rope shovel capacity and
why we need so much steel to carry what is often a very poor payload.
How is it possible that best practice in
dipper performance provides a payload of 2.16 times capacity but the dominant
manufacturers provide dippers which only achieve around 1.70 times
capacity? This is more than 20% less payload for the same capacity and
around the same weight of steel. This rhetorical question actually has a
real answer. It is because the mines don’t care. So
long as it keeps going and is supported when it breaks then that is OK.
Many mines don’t even complain when the loader truck match is 2.5 or 3.5.
To someone who has worked in equipment productivity for over 20 years this is
really depressing.
Looking at some issues which
impact shovel payload. Firstly, dipper issues which the mine can have
some impact on. The tooth attack angle is really important. Payload
increases by around 0.5% per degree as the tooth attack angle is
increased. However, it is not possible to simply keep steepening the
tooth attack angle of the dipper due to the interaction between the heel and
the bank. Relative heel wear rises exponentially after about 65 degrees
tooth attack angle. By 70 degrees the heel wear is probably unacceptably
high. Many buckets are in the range 50-55o and are losing a
lot of payload.
The concept of Bail vs Bail-less is a function of where the hoist
connection is made to the dipper. The
connection of hoist ropes at the rear of the dipper increases payload.
Where the connection is 25% along the dipper the difference is -10% which is
significant.
The width : height : depth ratios
as well as teeth arrangements have an impact on payload but there is little
impact site people can have on these issues once you have the dipper so I won’t
expand on these issues here.
The other side of the payload
issue is operational issues. Many of these can be controlled by the
mine. What is being dug causes variation in average payload by up to 20%
in the same dipper. Herein lies a significant issue relating to truck/shovel
matches. It is possible that the same dipper, even on the same minesite,
can get differences in payload of 20% simply due to the spoil being dug. The key to higher
payload is the degree of fragmentation. The highest payloads are achieved
in spoil where there is a range of particle sizes; not all large and not all
small. The implication is that payload is significantly enhanced by good
blasting practices.
The power made available to the
operator has a major impact on payload. In harder digging, ie. blocky,
poorly shot, etc., increased power provides increased payload up to 120% of the
standard power level. In softer spoils the shovel dipper achieves higher
payloads at lower power levels. In summary, it is beneficial (in terms of
payload) to increase power to the maximum.
Bench height plays a major role
in determining payload. At any bench height greater than 30% of boom
point height a full payload can be achieved consistently. Similarly, the
distance from the face has a major impact on payload. The variation from
cycle to cycle is quite large but a consistent trend is seen for each digging
position. The first few digs have the loading unit very close to the
face. During these cycles the payloads are reduced possibly due to the
inefficient application of power to the trajectory of the dipper / bucket.
The payload increases as the face “moves” away from the shovel. Once the
dipper starts having trouble reaching the face the payload reduces quite
quickly. The decision about when to move the loader is not an easy
one to get right. Generally the operator will decide to move the loader
when they encounter difficulty in loading the truck in the designated number of
cycles. To optimise the productivity a range of factors need to be
considered, including, payload, fill time, another truck waiting, what the face
is like. As a general observation, if the loader is under-trucked, it
would appear prudent to move the loading unit frequently. If the shovel
is over-trucked it becomes a multi-dimensional equation as to when the most
efficient time to move is.
It became evident from a very
early stage in the work on shovels that on some loading equipment the
efficiency of the bucket / dipper was severely compromised by large voids
inside the dipper / bucket (Figure 1). These voids ranged from 5% inside
a backhoe bucket up to 25% inside rope shovel buckets. The impact of
these voids is included in the previously described impacts on payload.
Finally I would direct your
attention to Figure 2. This shows the variation in dipper payload for
P&H and Cat (previously Bucyrus), (both unidentified) and VR Mining
Dippers. I have spent my career helping mines be more productive and the
VR Mining dipper is the most efficient dipper design I am aware of. I am
aware there are maintenance, support and financial issues to purchasing a
dipper but speak to dipper manufacturers, not just the OEM, the next time you
want a dipper.
Just so you know: I worked for
VR Mining in 1997 and 1998; before they designed this dipper. GBI has had
a number of small consulting jobs from VR Mining over the last 10 years.
I had no input into the VR design. Neither I nor GBI receive anything
from anyone for the comments made here. They are simply my honest opinion
– the VR dipper is the best and the mines are costing themselves a bundle by
not looking at it. Even if the mines used this fact to put pressure on
P&H and Caterpillar to do better, the industry would benefit.
Wednesday, 11 July 2012
Truck and Loader Matching Part 4
Over the last few weeks I have
systematically pulled apart the issue of nominal truck capacities to
demonstrate why big mining trucks achieve 5-15% below what the manufacturer
says they should get on average. I don’t believe this is an issue that
too many truck manufacturers’ want to address and the cynical side of me
suggests that this article won’t help. Maybe a single voice in the
wilderness can gain support to force change.
My focus is on mines moving
more for less and apart from the engineering design work to increase the
capacity of trucks from the 150 tonne maximum size 25 years ago to the 360
tonne maximum size now I don’t think that the truck suppliers have helped the
“move more for less” equation too much. Even the notion of bigger trucks
being a great innovation and assistance in efficiency enhancement is
questionable. I will repeat something from a previous blog. On the
whole bigger trucks are less efficient than smaller trucks. They carry
less payload (as a percentage of nominal capacity) and work less hours.
However, this is not a consistent picture between OEM’s. In terms of
nominal capacity the 360 ton trucks are 50% bigger than a 240 ton truck.
however, in terms of actual annual capacity, average 360 ton trucks move just
20% more than 240 ton trucks. I am not pointing the finger at one
supplier.
Figure 1 shows the 2010 median
performance for each major mining truck make and model. Some of the older
and newer models are not included due to lack of data. Mining truck
performance is presented in this analysis as annual tonnes (normalised for full
year operation) * km travelled per tonne of nominal tray carrying capacity.
Trucks with different
designations (usually A, B, etc used by Cat and Liebherr) have not been
separated in this analysis. The capacities for these “sub-models” are
generally similar as is the output. It is important to note that
this plot does not attempt to say whether the make and model results actually
reflect better trucks or the operating characteristics of the sites at which
they are used. The trends with increasing size of mining trucks are
mixed. The Liebherr trucks become more efficient with increasing size
while the Cat trucks become less efficient with increasing size. The
Hitachi, Komatsu and Terex trucks achieve peak efficiency with the 240 ton (218
metric tonne) capacity size EH4500, 830E and 4400 respectively. The
larger capacity trucks are not as efficient with these OEM’s. Of the
larger trucks the Liebherr T282 is the highest performer with Terex and Komatsu
both achieving 20% less annual tkm/t and Cat 23% less annual tkm/t. It is
not without precedent for larger equipment to have lower unit production (ie.
draglines) however, the exceptional performance of the Liebherr T282 range
demonstrates that this is not a necessary outcome. Another clear finding
from this plot is that the performance of the smaller Cat trucks (777 and 785)
was, and continues to be, relatively high. They however, are not suitable
for loading with the larger loaders.
This industry has lived in a
world where bigger is better. But frequently when bigger equipment is
released it just doesn’t perform well. Those of us who remember the
release of 240 ton trucks would remember that they had real problems. It
seems too easy for a poorly performing mine to just get bigger equipment and
that is what they tend to do. They waste more millions of dollars when
the improvements they need are available by just operating more efficiently and
would actually cost very little.
To demonstrate this point I
will set up a scenario of a PC8000 hydraulic shovel loading Cat793
trucks. These have not been chosen for any particular reason except it
should be a comfortable three pass match. The average PC8000 loader will
require 7.5 average Cat 793 trucks. Four crews plus spares plus trainees
(you should always have a pool of people training) probably means around 40
truck drivers. If a mine then goes and purchases Cat797 trucks the
typical method of determining number of trucks is to simply work out the
proportional capacity. New trucks = old trucks * 793 capacity / 797
capacity. Using this formula five new Cat797 trucks would be purchased
with the expectation that around 13 people would be saved along with reduced
running and maintenance costs. Unfortunately, this scenario is
fictitious. In the real world the PC8000 on average needs 5.8 * 797
trucks and only saves 9 people. Bigger trucks cost more to buy and more
to run, so how far ahead are you?
OK so returning to the real
point of this column; technology is progressing fast. We now know that
trucks are not carrying the nominal payloads. This has not gone unnoticed
by companies which make their way in the world by making equipment work
better. For the OEM the real money seems to be in the chassis and
tyres. Improvements in payload are coming from specialist tray
suppliers. Truck trays are no different to most other mining
equipment. What the equipment carries is made up of steel and payload and
the aim is to maximise the payload and minimise the steel while achieving
acceptable life. In the past with trucks this was a nothing equation
because OEM’s told the mine what payload the truck would carry. We now
know this was almost always wrong. Truck trays seem to be following where
the industry has been with draglines. Now Bucyrus and P&H build
draglines and shovels but CQMS currently build the most efficient dragline
buckets while VR Mining have the most efficient shovel dippers. In trucks
you have specialised truck tray manufacturers like DT HiLoad, Duratray, Esco,
Philippi-Hagenbach, Westech, etc. who seem to get it; the chassis is built to
carry a certain load and if you can reduce tonnes of steel and increase tonnes
of payload then the mine must be ahead.
It is my proposal that we must
here and now dispose of SAE Standard J-1363 for calculating truck capacity the
same way suppliers have disposed of the CIMA formula for dragline bucket
capacity. We must also stop rating trucks based on a nominal
payload. We should establish a rated capacity for the truck trays which
is struck capacity (contained capacity with no heaping according to computer
models) multiplied by a factor. With dragline buckets the factor is 0.9
which I have always disagreed with but everyone knows it and accepts it.
I believe the rated capacity of a truck tray should be equal to the struck
capacity, (factor = 1). In the same way that we have a Bucket Efficiency
Ratio for draglines and a Dipper Efficiency Ratio for shovels, which is payload
/ rated capacity, we need a Tray Efficiency Ratio (payload / rated capacity)
for trucks - TER. There is also a steel weight ratio (Tray Unit Weight
(TUW)), which is the weight of the tray divided by the rated capacity. The
formula for the optimum truck tray rated capacity is then;
OTC
= GVM – Chassis Wt
TER + TUW
Only then can we get the best
tray design with the right capacity to meet the gross vehicle mass. At
least then we will be covering Step 1 in the optimisation process; mines will
be selecting the right piece of gear.
Wednesday, 28 March 2012
Mining and complexity – paradigm, paradox or parody?
I introduced the issue of
complexity in my last blog and stated that there is little evidence in open cut
equipment production data that “complexity” plays any role in decreasing
equipment productivity over time. This is a controversial view in the
mining industry, particularly the large mining companies where increasing
complexity has been used as an excuse for falling equipment productivity rates
for some years now.
I stated in my last blog;
It is my theory that the corporatisation
of the mine site is to blame for the reduction in availability and consequent
productivity. It is the focus on process and not the result.
Managers are often judged on how they do their job, not the end result, and a
declining result can be hidden behind exceptional processes. Part of that
change is an increasing focus on safety but not the majority of it.
Because most managers have little real natural management expertise they
embrace the processes which are encouraged by corporatisation. Six Sigma
or Lean are great because they provide the manager with a focus on
process. You can actually point to what you have done.
Unfortunately the performance metric is wrong.
I believe that the silent
majority support this view but many just have to fit within the confines of the
company that employs them. I received the following from someone running
a mine this week after they read my last blog (that makes two of us who read
it).
You are so right about people
getting hung up about the process of a process and the process of process
improvement rather than the bottom line impact of the outcome it produces
You can extend this further by
explicitly focussing on added value as the principle and proper measure of
improvement. eg "For any given operational outcome, a process
'improvement' that does not measurably generate positive added value or improve
safety without negative impact on the firm's overall value is no improvement at
all." No matter how exceptional it might be.
This industry needs to take
more notice of Prof Michael Porter - the father of the value chain concept. He
had it spot on. If it doesn't add measurable value, prune it.
However, remember not all value is financial - reputation, employee wellbeing,
and other "soft" forms of value also matter to different degrees in
different companies.
Six Sigma and Lean do not cover
the value chain concept well I reckon, and their experts too frequently have no
wider business management training to know any better.
A few other personal
operational observations for you;
- Pits do get more complex
sometimes but usually just deeper and/or less "rich". Any
complexity is mostly human induced.
- You are right about
availability being a function of age. BUT its more complicated and its
only true beyond a certain age. There is a trade-off between depreciation
of new equipment with age and repair with age on 2 axes vs availability
with age on the third. If you map profit (or net value added) against
these axes you will find here is a reasonable sweet spot for average fleet
age where profit is maximised - and it’s not at any of the extremes.
Operational rosters (eg 4 days a week, 24*7 etc) change the sweet spot
quite a bit.
- I've never seen any specific
mining industry research on this and there are a lot of misconceptions out
there.
- Availability is an issue but
not the only one. Cost saving pressures, lack of professional knowledge,
managerial ignorance and inappropriate performance metrics are an even
bigger part of it. Maybe some would argue this is the actual
"complexity" causing most of the problems, eg...
- Payload and digging cycle time
(esp truck shovel) are affected (often severely) by poor pit design
(relative to deposit and equipment), poor road placement, poor matching of
blast performance, poor dump design, but also limited communication
between the engineers and mining supervisors - the latter usually make the
shift to shift decisions with no knowledge or understanding of the
former's work (= poor decisions frequently).
I will repeat my last paragraph from the last column. Commodity prices (maybe with the exception of gold) are going to decline. You won’t be able to keep making money without focusing on the real reason you are in business. You need more of your commodity going out the gate at a lower cost, not a new business improvement process every week or month.
Graham Lumley
BE(Min)Hons, MBA, DBA, FAUSIMM(CP), MMICA, MAICD, RPEQ
Labels:
availability,
Business Improvement,
complexity,
decision making,
dragline,
equipment selection,
GBI,
gbi mining,
graham lumley,
innovation,
mining,
mining equipment,
Paradigm,
Paradox,
Parody,
payload,
productivity
Tuesday, 20 March 2012
Complexity and Productivity
If you were to ask a mining
executive why their mines’ equipment performance has reduced over time, apart
from spluttered expressions of disbelief from some you would certainly get the
issue of mining complexity fairly high in the excuses. This is because
site people use this excuse almost universally when asked why their performance
has reduced. It seems logical that mines dig the easiest / most
profitable areas first and conditions do generally become more difficult over
time.
When executive management
starts holding site people accountable for the equipment performance it is
interesting to see what happens. It usually goes something like this;
- Dry up the source of the bad
news – ie. stop benchmarking. “We know we are 40% below best
practice so why keep telling Executive Management”.
- Advise management that reducing
performance is a function of complexity of the mine. “We know it is
getting worse and we know it must be the increasingly complex mine we are
running.”
- Create a picture of how
complexity reduces digging hours or increases cycle times, etc.
However, should equipment
achieve less output as the mine becomes more complex? This really is a
perfect example of not letting the truth get in the way of a good story.
We have looked at this issue from multiple angles and we can’t find any
evidence to support this notion that complexity reduces the performance of a
particular piece of equipment. Even for trucks if you use an appropriate
measure of truck performance there is no consistent reduction in performance.
Of course as a mine gets deeper and more complex, more equipment may be
needed. This is a completely different issue.
So let’s look at the
truth.
The absolute key to the
performance of any piece of equipment is payload. I can’t find any logical
explanation as to why complexity should consistently impact payload. The
only possible impact could be in bench heights and/or pit layout.
However, if superintendents and engineers do their job there is rarely a reason
not to set the pit up to ensure optimised payload. The differences in
payload (eg. The difference between dragline best practice and average is 17%
and other equipment is similar) are inevitably caused by other factors.
The most common and most distressing is mines telling operators not to fill up
the bucket or truck body and kicking the operator when they do!!! For
heaven’s sake the operator’s job is to fill up the bucket and he/she should be
encouraged to do this to the best of their ability every time. If it is
overloaded then don’t blame the operator; this is a management failure.
OK so it can’t be
payload. Is digging time related to complexity? The key area that
gets blamed is operational delays and most specifically waiting on equipment or
blast. We have tracked operational delays and we know that when
productivity drops, about 40% of the drop can be linked to operational delays
but only about 6% is linked to waiting on something. So really it has
little to do with waiting on equipment or blast. Yes there is a relationship
between complexity and operational delays but the major loss in productivity is
found elsewhere.
Often the major contributor to
a loss in productivity over time is availability. What happens is that
there are two key relationships. Complexity increases with time and
availability tends to reduce with time. The truth is the two
relationships are only linked in a very minor way. So is it equipment
getting older and harder to keep going? Maybe, but old equipment does get
replaced and the trend does continue.
It is my theory that the
corporatisation of the mine site is to blame for the increase in operating
delays; the reduction in availability; and consequent reduction in
productivity. It is the focus on process and not the result which is
primarily to blame. Managers are often judged on how they do their job,
not the end result, and a declining result can be hidden behind exceptional
processes. Because most managers have little real management expertise
they embrace the processes which are encouraged by corporatisation. Six
Sigma or Lean are great because they provide the manager with a focus on
process.
A bit of a wake-up call
here. Commodity prices (maybe with the exception of silver and gold) are
going to decline. You won’t be able to keep making money without focusing
on the real reason you are in business. You need more of your commodity
going out the gate at a lower cost, not a new business improvement process
every week or month.
Graham Lumley
BE(Min)Hons, MBA, DBA, FAUSIMM(CP), MMICA, MAICD, RPEQ
Monday, 12 March 2012
Recognising Innovation
Australians
on the whole are not overly innovative and regularly fall below average in
measures of innovativeness across countries around the world. There is
little doubt that this contributes to poor equipment performance. I noted
a little while back where Dr Peter Lilley of CSIRO was lamenting the lack of
“transformational” R&D. I was staggered (although maybe I shouldn’t
have been) that the Minerals Down Under group has a budget of $100+ million per
year for R&D. Think about that for a minute. Over $100 million
per year and they can’t come up with some workable transformational
ideas? You have got to be kidding.
A
project which my company undertook was one of the outstanding engineering
projects which won Engineers Australia State awards and competed for National
Awards in Canberra recently. What a privilege to be amongst some truly
transformational engineering. Our project – Optidrag, had a budget of
$276,000 (thank-you to ACARP). Now Optidrag really is transformational
and is being embraced by a number of the major mining companies.
I
am sure this industry suffers a serious case of Myopia when it comes to
innovation. Here you have a project which is one of the outstanding
engineering projects in Australia in 2009, as judged by Engineers Australia,
and the Australasian Institute of Mining and Metallurgy rejected it as being
unsuitable for one of their Mining Conferences. Quite apart from the fact
that it is my project and I was prepared to fly across the country to present
it in Perth, how can a project recognised by the pre-eminent professional
engineers association in Australia as one of the outstanding engineering
outcomes in 2009 be not recognised by my esteemed colleagues in the mining
industry?
Sour
grapes? You are joking. I got to sit in Parliament House in
Canberra with the engineers who were recognised as having the most outstanding
projects in Australia in 2009. I happily saved my money and did not
attend the conference in Perth but I am distressed for the industry I work
in. I side with Dr Peter Lilley in so far as believing this industry
needs transformational change. However, I believe it is needed in
R&D, technology and attitudes.
The
biggest problem with research and development in Australia is they are too
focussed on the process rather than the outcome. Tick the boxes, get your
government money and if it costs more than budget or you don’t get an outcome
then so be it. Move on to the next project. Compare that with the
private sector. We are currently developing a new product. Exciting
and terrifying at the same time. We went to Westpac, cap in hand and
asked them to finance a shoestring budget. They took mortgages over our
properties, a fixed and floating charge over the business, personal guarantees
by the owners of the company (my wife and I) and security on our souls in case
we decide to depart this world (watch out - banks have contacts in high and low
places, although not too many above). If we can’t produce a product when
the money runs out we are screwed. If the product fails to sell we are
screwed. Despite our patent protection, if a big company steals the idea,
I can’t afford to fight it for 10 years in the courts – we are screwed.
If a Rio or BHP fund it they will rightly tie it up so not only does nobody
else get it, we also can’t do any further work on it. The research
organisations haven’t delivered and small people have incentive not to be
innovative.
Transformational
changes in technology don’t come along too often. You can think about
draglines, hydraulic shovels, etc as being major advances but they are few and
far between. The thing which concerns me is that sometimes ideas are not
advanced for the wrong reasons. Politics in our large mining companies
and our research institutions ensure some truly transformational ideas will
never see the light of day. Consider the following. After
presenting Rio Tinto's automation work to the Austmine conference in Brisbane
last May, Rio Tinto's head of Innovation, John McGagh, was asked how we, as
small, dynamic innovators could get our products in front of Rio Tinto.
His response was distressing. "Rio have people and resources working in
this area. If you have something of value to us, we will find
you." I really don't know where to go with that. I suppose it
is the golden rule; He who has the gold makes the rules.
I
have said much in recent weeks about transformational changes in attitudes
towards productivity. Productivity is largely about attitude. I
fear for Rio's investment in automation for this very reason. Attitude is
the key input into the differences between best practice operations and the
other 90%. Some have given up and accept mediocrity or pay contractors to
be mediocre or make huge investments in technology. Some mines and
contractors have grabbed the opportunity and have moved to fill the gap between
average and best practice performance. They are the companies you really
want to work for and with.
Graham Lumley
BE(Min)Hons, MBA, DBA, FAUSIMM(CP), MMICA, MAICD, RPEQ
Tuesday, 22 November 2011
A Productivity Attitude
The primary aim of these articles is to get members of the
mining community to think about productivity. Productivity is about
attitude. Much can be learnt about the theory behind operating different
pieces of equipment and improving productivity but if the mine does not have a
‘culture of productivity’ then achieving best practice is virtually impossible.
Being innovative helps but just doing the simple things well is a
really good start.
The profitability of many mines is highly leveraged
against the productivity of the major earthmoving equipment and thus
significant management effort should be focussed on getting the most out of
this equipment. Unfortunately exactly what this entails is not always
well understood and often other activities are given preference sometimes to
the detriment of equipment productivity. The actions of mine planning,
blasting, scheduling, maintenance and man management all play a significant
role in production but need to have a common productivity focus or else they
can negatively impact the equipment performance.
Figure 1
Figure 1 is the way many mines are run. The
processes in running the mine and the requirements of the corporate entity
simply work against getting optimal performance. In addition, people with
an innovative attitude soon get put in their place and drowned within the
bureaucracy. People on these mines are too concerned with ticking career
boxes and making sure the processes are all in place, but when it comes to
doing something there is always a good reason not to.
Figure 2
The productive mine (Figure 2) shows a different flow of
“impacts”. We now make the equipment productivity central to the mine’s
performance, (which is exactly where it should be…surely). People and
personalities become less important and the requirement for equipment
productivity becomes of primary importance.
The equipment productivity is now “driving” other aspects
of the mine operation. It is no longer acceptable for mine planning to
impact productivity negatively; they know what is expected of the equipment and
they produce plans which help the equipment achieve it. Blasting,
scheduling, maintenance, management, etc. are all the same. The mine has
an expectation of performance (which I believe should be dictated by what best
practice machines achieve) and every role within the mine should be singularly
focussed on helping the mine achieve the required productivity. We have
inevitably found that this is the way which mines achieving best practice
operate.
There is a saying along the lines, “the best things in
life are free”. I find it hard to forget as I had to debate this in Year
10 English. I now prefer to say that the best productivity improvements
are free (or nearly free). Productivity is about people and attitude and
it costs no extra for a mine to have a “productivity attitude”.
I have referred previously to Robe River Mine and the
upheavals which took place in 1986 under the guidance of Charles Copeman.
At the end of the resources boom which commenced in 1977/78, mining companies
were starting to tighten their belts. Unfortunately this belt-tightening
was resisted by workforces which had become accustomed to getting things their
own way. This attitude was promoted by management which made money
despite themselves. Robe River was the first to face the prospects of an
extended “difficult” period by attempting to change the attitude of the
mine. I suspect Charles Copeman knew where it would lead as changing a
culture is not an easy thing to achieve. When change did not come Copeman
sacked the management team and installed “his” team of people with the attitude
he wanted. Copeman recognised that change had to start at the top and
work its way down. Sure, it did eventually work its way through and the
workforce was sacked and then selectively reemployed some on significantly
different working conditions, but the important lesson to learn here is that
the change started with management.
This was the start of the depressed period I call the
“Downsizing Period”. It ran from about 1986 – 2001. I remember one
day going on to a mine site (1996 I think) I often visited which had a big sign
out the front. Employee numbers usually ranged from 380 – 400. This
day, the number was 196. I had to look at it a couple of times but it
made an indelible impression on me.
The mining industry has now entered the next difficult
period. Forget the super-cycle or a quick rebound. The largest
economy in the world is bankrupt as is the Eurozone and demand for goods will
remain depressed so demand for commodities will remain depressed. I
believe this period will run at least 12 more years (probably longer).
Most mines are now like the proverbial stone which has had the blood ringed
from it when it comes to people. You just can’t keep cutting people and
keep the mine going. Once Executive Management and Boards of Directors
realise that prices are coming down they will have no option if they want to
stay in business but to chase improvements in equipment productivity. I
wonder if they will follow Charles Copeman’s lead and start with mine managers
who accept mediocre or average performance (in this case of their
equipment)? Most operators’ jobs are safe because most of them actually
want to do a better job and just need management to help them achieve it.
Graham Lumley
BE(Min)Hons, MBA, DBA, FAUSIMM(CP), MMICA, MAICD, RPEQ
Sunday, 13 November 2011
When to spend on innovation
I have
introduced a number of broad-based productivity issues over the last few
blogs. We will get on to some more specific issues but in this piece I
want to introduce another broad issue. What is the best time to invest in
productivity enhancement?
The two key
areas to productivity enhancement are during the R&D / equipment selection
phase and during the post-commissioning phase. That is, get the right
equipment and optimise its use.
To understand
the interaction between mining and knowledge I will return to the presentation
by Jari Kuusisto presented to the Smart Innovation Festival in Brisbane in May
2008. Kuusisto presented the curve of ROR vs Product Life Cycle. I
have added the risk and cost benefit to this to provide the following plot.
The product
life cycle can be described from the mine or the supplier’s perspective.
In the plot here it is viewed from the mine’s perspective. The mine
follows a process of Correct Selection – Order placement – Commissioning –
Equipment Enhancement.
The rate of
return on money invested is highest during the development / selection stage of
the product and during the after-sales service / equipment enhancement
phase. However, the risk on the investment is highest early in the
process and reduces further after the product has been delivered.
When these two plots are combined it can be easily seen that the cost-benefit
(return / risk) is moderate at the start of the process (during R&D /
selection) and highest after delivery/commissioning (during the process of
“asset optimisation” or “capacity utilisation”). It is no coincidence
that the application of knowledge is needed most during these two
sections. It can therefore be deduced that the input of knowledge is
related to cost benefit. It is also interesting to note that the highest
cost benefit occurs when the knowledge is applied in the after-delivery phase
of equipment optimisation which is largely process related.
If one looks
at this from the perspective of a supplier the product life cycle
becomes: R&D, Collect Orders – Commissioning – After Sales Service.
Interestingly, the plot follows exactly the same form. For the equipment
supplier their greatest return comes in after-sales service. This is a
really interesting observation because during the boom I had an almost
impossible job getting suppliers to listen to anything to do with knowledge and
after-sales support. Suppliers apparently were able to sell all their
equipment and the concept of using after-sales service and knowledge as a means
of helping mines use their equipment better and as a point of strategic
advantage wasn’t considered. This has clearly changed. I have had a
number of companies approach us about using the data and knowledge as a key
element in their marketing strategy. During the boom nobody seemed to
care that there was one brand of truck which was 84% more efficient than the
worst. Funny isn’t it? During the boom if it had wheels and carried
dirt it was good enough. Now a lot of mining people don’t seem to want to
take the risk that they will buy the worst truck and some suppliers seem
motivated to use data to help them be as good as their equipment allows them to
be on the mine sites.
It seems
prudent for suppliers to understand the words of S. Downton on
ecustomerworld.com,
Delivering high levels of
customer satisfaction through a well-managed service operation can increase loyalty,
and thereby sales, by as much as 8 times - greatly enhancing the value of the
business. Successful manufactures increasingly focus on their customers' total
lifecycle by investing in their service management business to maximise the
value captured throughout the product lifecycle. This means that the product
sale is only a small part of the overall value during the complete product
lifecycle and is only the start of the customer relationship.
Support for
my belief that the world of suppliers has changed came late last year when we
found a bucket manual which I had written for a mine to optimise the
performance of the bucket they had just purchased, had been blatantly
plagiarised by the OEM and presented to other mines purchasing their product
under their name and logo. This supplier has seen the value of knowledge
(particularly linking the knowledge to the company) and has seen it as
providing strategic advantage for them.
Graham Lumley
BE(Min)Hons, MBA, DBA, FAUSIMM(CP), MMICA, MAICD, RPEQ